1.Install an M4 shoulder screw on the bottom signage mounting hole of each Top Pole.
2.Mount the Signage to the Top Pole by hooking the bottom bracket of the Signage to the M4 shoulder screws on the Top Pole.
3.Secure the top side of the Signage assembly using an M4 flathead screw on each side.